Gateway Building | Scott Brownrigg

 A stunning new 210,000 sq ft gateway development has been completed on the world-renowned Cambridge Science Park. The gateway building was designed by global architectural practice Scott Brownrigg and developed by property consultants Bidwells on behalf of Trinity College and TUS Park.

Gateway Building

©Hundven-Clements Photography

Gateway Building:

Known as Building 1&2, the development is the final stage of a five-building scheme completed by TusPark and Trinity, the founders of Cambridge Science Park. The scheme comprises a total of 380,000 sq ft of commercial space designed to facilitate and encourage the growth of high-tech and life science companies.

The objective was to replace some of the existing buildings which date back to the 1970s with a series of exceptional quality buildings that would transform the entrance to the Park. Acting as development managers, Bidwells helped bring the two partners together as well as oversee the construction process and fully let all five buildings.

Gateway Building

©Hundven-Clements Photography

The two-building design creates a flexible option for either single or multi-tenant occupancy – featuring a colonnade that sweeps across the front reflecting the curve of the adjacent road. The column spacing guides occupiers and visitors to the entrance, with wider-spaced columns emphasizing the entrance area and denser columns protecting office space

The entrance colonnade fins lay flat against the side elevations, creating a rhythmical façade system. These vary across the width of each building to provide office spaces with ample daylight without exceeding solar gain.

As well as creating a new area of the public realm between the two buildings, the design gives transparency to the buildings. It also supports the Park’s sustainability agenda has achieved a BREEAM Excellent rating, is superbly flexible, and is 90% efficient (NIA/GIA).

Gateway Building

©Hundven-Clements Photography

Building 1&2 is the largest development on the Cambridge Science Park and follows the successful completion of three other new buildings designed by Scott Brownrigg including a state-of-the-art Bio-Innovation Centre which was completed in 2019.

Maintaining a rhythm of verticality that mirrors the parkland surroundings, the group of buildings holds a common language of elegant simplicity in a beautifully landscaped public realm where innovators and entrepreneurs can collaborate in a relaxed setting.

Project Info:
Architects: Scott Brownrig
Location: United Kingdom
Area: 18590  m2
Project Year: 2021
Photographs: Hundven-Clements Photography
Project Name: Gateway Building

 

Arch2O.com
Logo
Send this to a friend