Győr-Gönyű National Public Port Control Building | sporaarchitects + Térhálózat

Designed by sporaarchitects + Térhálózat, In the middle of the path where the North and the Black Sea meet, at the 1,794 km mark of the Danube River and the Mosoni-Danube Estuary between Győr and Gönyű, along highway 1, the Győr-Gönyű National Public Port was constructed, serving as a freight logistics center.

photography by © Danyi Balázs

The design of the port control building was inspired by the strict system of port infrastructure and the riverbank overlooking the harbor as well as the vigorous movement of the water on the other side of the river. The service building acts as a multifunctional port inspection unit, including a communication system with the barges in the river, boats for disposing and storing waste and hazardous materials, car storage, offices, water quality test labs, meeting rooms and guest rooms.

photography by © Danyi Balázs

The port also serves as a junction of water, road and railroad transport. The ground floor of the building precisely follows the east-west direction of the railway transport system. The components of the building consistently fit a vertical segmentation. The ground floor is reinforced with a concrete frame, through which the anchoring elements of the cantilever steel staircase can be crossed. There is a glass structure extending over the road to the riverside, allowing the user to supervise the work in the harbor, as well as providing a panoramic view of the natural scenery provided by the surrounding area. The ground level office section is where the workers are located, but additional rooftop gardens and terraces are provided on the exterior.

photography by © Danyi Balázs

The building is divided according to the function. On the ground floor, in a wedge perpendicular to the shore, there are offices, guest rooms, executive offices and a meeting room, parallel to the river. All functions are directly accessible from the lobby. The elevated floor is surrounded by a sun-shaded side of the building as well as a south-facing shading system that can be opened on both sides of the meeting room. The shaded galvanized surface of the shade under the changing light conditions puts the building in a different garment.

photography by © Danyi Balázs

Implementation of modern technology in the design makes the building highly efficient in both energy and labor. The heat and electricity of the building are controlled by environment-aware technologies. When filling the partition, the soil was placed and the photovoltaic system makes the building self-maintained as stored rainwater is used to keep the roof garden alive. A communication antenna tower was implemented on the south side of the building, allowing for workers to better cooperate with each other but more specifically making communication between the building and the harbor easier.

Project Info:
Architects: sporaarchitectsTérhálózat
Location: National Public Port Győr-Károlyháza, Kikötő l. 0691/4 hrsz., l 0691/4 hrsz., 9011 Hungary
Architects in Charge: Ádám Hatvani, Attila Korompay, Tibor Dékány
Area: 708.0 m2
Project Year: 2016
Photographs: Danyi Balázs
Manufacturers: Schüco, Nagév Rács Kft, Weinberg’93 Építő Kft, FA-FERI Kft, DLW Flooring GmbH
Project Name: Győr-Gönyű National Public Port Control Building

Arch2O.com
Logo
Send this to a friend